Schedule Monte Carlo

Project completion as a distribution, not a date — Monte Carlo over the task graph. Use when a plan's finish date came from summing 'likely' estimates (it's wrong, mathematically), when leadership needs a commit date, or when you need to know which tasks actually control the timeline. Produces P10/P50/P90 completion, per-task criticality (how often each task sits on the critical path), and a real .xlsx — via the bundled zero-dependency simulator, deterministic with a seed.

1,573 stars 281 forksProductivity & Notes Plugin marketplace

Install

Claude Code plugin
/plugin marketplace add mohitagw15856/pm-claude-skills

The repo is a Claude Code plugin marketplace. Run /plugin afterwards to pick the plugin that includes this skill.

skills CLI (Claude Code, Cursor, Codex and more)
npx skills add mohitagw15856/pm-claude-skills --skill schedule-monte-carlo
Manual install
git clone --depth 1 https://github.com/mohitagw15856/pm-claude-skills.git /tmp/pm-claude-skills
mkdir -p ~/.claude/skills
cp -r /tmp/pm-claude-skills/plugins/pm-calculators/skills/schedule-monte-carlo ~/.claude/skills/schedule-monte-carlo

Personal skills live in ~/.claude/skills. Use .claude/skills in a project folder to share a skill with your team.

From the SKILL.md

# Schedule Monte Carlo

Summing the "likely" estimates systematically understates the finish: parallel branches mean the *slowest* path wins each roll, and that maximum is always worse than the middle. This skill runs the actual simulation — thousands of schedule rolls over the dependency graph — and reports the date the way it behaves: as percentiles.

## Required Inputs

- **The task list with three-point estimates** — per task: optimistic / likely / pessimistic (any consistent unit) and dependencies. Honest pessimistics are the whole game: "what if the API vendor ghosts us for two weeks" belongs in that number.
- Simulation count and seed (optional; defaults 5,000 and a fixed seed — results are reproducible).

## Output Format

1. **The headline gap** — deterministic finish (sum-of-likelies) vs P50 vs P90, side by side. The deterministic-to-P50 gap is the lie the old plan told; show it first.
2. **The commitment guidance** — promise P50 internally, P90 externally; the space between is the honesty budget. Name the dates.
3. **Criticality table** — per task, the share of simulations where it sat on the critical path. The top 2-3 are where management attention belongs; a task at 0.9 criticality with a wide estimate range is the schedule.
4. **Model limits** — no resource contention or calendar effects; real schedules are worse, so these are optimistic floors.

## Programmatic Helper

Ships `scripts/schedule_sim.py` — **zero dependencies**, cycle-detecting, deterministic:
Read the full skill on GitHub

Details

Skill name
schedule-monte-carlo
Path
plugins/pm-calculators/skills/schedule-monte-carlo/SKILL.md
License
MIT
Repo updated
18 November 2026

FAQ

What does the Schedule Monte Carlo skill do?

Project completion as a distribution, not a date — Monte Carlo over the task graph. Use when a plan's finish date came from summing 'likely' estimates (it's wrong, mathematically), when leadership needs a commit date, or when you need to know which tasks actually control the timeline. Produces P10/P50/P90 completion, per-task criticality (how often each task sits on the critical path), and a real .xlsx — via the bundled zero-dependency simulator, deterministic with a seed.

How do I install the Schedule Monte Carlo skill?

Claude Code plugin: /plugin marketplace add mohitagw15856/pm-claude-skills. Skills go in ~/.claude/skills (personal) or .claude/skills (project), and Claude loads them automatically when a task matches the description.

Is Schedule Monte Carlo popular?

It lives in mohitagw15856/pm-claude-skills, which has 1,573 GitHub stars and 281 forks, and is included in 1 curated skill list.

Related skills

Ab Test Planner

1.6k

mohitagw15856/pm-claude-skills

Diseña pruebas A/B estadísticamente rigurosas para características de producto, cambios de UI, flujos de onboarding y experimentos de precios. Úsalo cuando te pidan configurar un experimento, diseñar una prueba A/B, calcular tamaño de muestra o interpretar resultados de pruebas. Produce un plan de prueba completo con hipótesis, definición de variantes, tamaño de muestra, estimación de duración, métricas de seguridad y una guía de interpretación de resultados.

Testing & QAIn 1 list281

Ab Test Planner

1.6k

mohitagw15856/pm-claude-skills

प्रोडक्ट फ़ीचर, UI बदलाव, ऑनबोर्डिंग फ़्लो और प्राइसिंग प्रयोगों के लिए सांख्यिकीय रूप से कठोर A/B टेस्ट डिज़ाइन करें। जब कोई प्रयोग सेट करने, A/B टेस्ट डिज़ाइन करने, सैंपल साइज़ निकालने या टेस्ट के नतीजे समझाने को कहे, तब इसका उपयोग करें। परिकल्पना, वेरिएंट की परिभाषा, सैंपल साइज़, अवधि का अनुमान, गार्डरेल मेट्रिक और नतीजों की व्याख्या की गाइड के साथ एक पूरा टेस्ट प्लान तैयार करता है।

Testing & QAIn 1 list281

Accessible Travel Planner

1.6k

mohitagw15856/pm-claude-skills

Summarise what Accessible Travel Planner does in one line. Use when asked to [trigger phrases the user would say]. Produces [the concrete artifact].

Frontend & DesignIn 1 list281

Schedule Recipe

1.6k

mohitagw15856/pm-claude-skills

Turn 'run this every Friday at 4pm' into a working, copy-paste schedule on the user's actual runner. Use when asked to schedule a recurring AI task, set up a routine or cron job for a skill, automate a weekly report, or wire a skill into n8n or GitHub Actions. Produces the exact setup for the chosen runner plus the prompt to run, failure alerting, and a first-run test plan.

Productivity & NotesIn 1 list281

Pm Weekly Review

1.6k

mohitagw15856/pm-claude-skills

Structure a PM's weekly review and planning session. Use when doing a weekly PM review, writing a weekly update, preparing for Monday planning, or reviewing sprint health. Produces a shareable weekly update covering metrics movement, shipping progress, blockers, insights, and next week's top 3 priorities.

Productivity & NotesIn 1 list281

Site Safety Briefing

1.6k

mohitagw15856/pm-claude-skills

Produce a toolbox talk or pre-task safety briefing from the day's planned construction work. Use when asked to write a toolbox talk, prepare a pre-task plan or JHA/JSA briefing, brief a crew on today's hazards, or plan safety for a specific task like a crane pick, excavation, or hot work. Produces a crew-ready briefing with task-specific hazards, controls ordered by the hierarchy of controls, required permits, and explicit stop-work triggers.

Productivity & NotesIn 1 list281

Browse the most popular Claude skills, all productivity & notes skills, or write your own with the skills generator.