Delay Claim Letter

Draft a construction delay notice or delay claim letter with contract clause citation, cause classification, and critical-path impact narrative. Use when asked to write a delay notice, put the owner or GC on notice of delay, draft a time extension request, respond to weather or owner-caused delay, or paper a delay for a claim. Produces a notice/claim letter with the excusable-compensable classification, critical-path impact narrative, quantum placeholder, reservation of rights, and a records-preservation list.

1,573 stars 281 forksResearch & Science Plugin marketplace

Install

Claude Code plugin
/plugin marketplace add mohitagw15856/pm-claude-skills

The repo is a Claude Code plugin marketplace. Run /plugin afterwards to pick the plugin that includes this skill.

skills CLI (Claude Code, Cursor, Codex and more)
npx skills add mohitagw15856/pm-claude-skills --skill delay-claim-letter
Manual install
git clone --depth 1 https://github.com/mohitagw15856/pm-claude-skills.git /tmp/pm-claude-skills
mkdir -p ~/.claude/skills
cp -r /tmp/pm-claude-skills/plugins/pm-construction/skills/delay-claim-letter ~/.claude/skills/delay-claim-letter

Personal skills live in ~/.claude/skills. Use .claude/skills in a project folder to share a skill with your team.

From the SKILL.md

# Delay Claim Letter Skill

Delay claims are won and lost on two things: whether notice went out inside the contractual window, and whether the delay can be tied to the critical path with contemporaneous records. This skill drafts the letter that does both — notice-clause citation up front, cause classified on the excusable/compensable matrix, impact told against the schedule rather than the calendar, and quantum reserved rather than guessed. It also tells the team what records to start preserving *today*.

## What This Skill Produces

- A **delay notice or claim letter** ready for letterhead and counsel review
- **Cause classification** on the excusable/compensable matrix, driving what's requested (time, money, or both)
- **Critical-path impact narrative** — affected activities, dates, and knock-on logic
- **Quantum placeholder** with reservation of rights (never a premature number)
- A **records-preservation checklist** for the project team

## Required Inputs

Ask for what's missing; from a thin brief, draft with gaps marked `[confirm]` and state that the notice clause citation must be verified before sending:

- **The delay event** — what happened, when it started, whether it's ongoing
- **Contract notice provisions** — clause number, days allowed, required form/recipient (the single most important input)
- **Who caused it / what class of event** — owner action, design issue, weather, third party, force majeure
Read the full skill on GitHub

Details

Skill name
delay-claim-letter
Path
plugins/pm-construction/skills/delay-claim-letter/SKILL.md
License
MIT
Repo updated
18 November 2026

FAQ

What does the Delay Claim Letter skill do?

Draft a construction delay notice or delay claim letter with contract clause citation, cause classification, and critical-path impact narrative. Use when asked to write a delay notice, put the owner or GC on notice of delay, draft a time extension request, respond to weather or owner-caused delay, or paper a delay for a claim. Produces a notice/claim letter with the excusable-compensable classification, critical-path impact narrative, quantum placeholder, reservation of rights, and a records-preservation list.

How do I install the Delay Claim Letter skill?

Claude Code plugin: /plugin marketplace add mohitagw15856/pm-claude-skills. Skills go in ~/.claude/skills (personal) or .claude/skills (project), and Claude loads them automatically when a task matches the description.

Is Delay Claim Letter popular?

It lives in mohitagw15856/pm-claude-skills, which has 1,573 GitHub stars and 281 forks, and is included in 1 curated skill list.

Related skills

Ab Test Planner

1.6k

mohitagw15856/pm-claude-skills

Diseña pruebas A/B estadísticamente rigurosas para características de producto, cambios de UI, flujos de onboarding y experimentos de precios. Úsalo cuando te pidan configurar un experimento, diseñar una prueba A/B, calcular tamaño de muestra o interpretar resultados de pruebas. Produce un plan de prueba completo con hipótesis, definición de variantes, tamaño de muestra, estimación de duración, métricas de seguridad y una guía de interpretación de resultados.

Testing & QAIn 1 list281

Ab Test Planner

1.6k

mohitagw15856/pm-claude-skills

प्रोडक्ट फ़ीचर, UI बदलाव, ऑनबोर्डिंग फ़्लो और प्राइसिंग प्रयोगों के लिए सांख्यिकीय रूप से कठोर A/B टेस्ट डिज़ाइन करें। जब कोई प्रयोग सेट करने, A/B टेस्ट डिज़ाइन करने, सैंपल साइज़ निकालने या टेस्ट के नतीजे समझाने को कहे, तब इसका उपयोग करें। परिकल्पना, वेरिएंट की परिभाषा, सैंपल साइज़, अवधि का अनुमान, गार्डरेल मेट्रिक और नतीजों की व्याख्या की गाइड के साथ एक पूरा टेस्ट प्लान तैयार करता है।

Testing & QAIn 1 list281

Accessible Travel Planner

1.6k

mohitagw15856/pm-claude-skills

Summarise what Accessible Travel Planner does in one line. Use when asked to [trigger phrases the user would say]. Produces [the concrete artifact].

Frontend & DesignIn 1 list281

End of Life Wishes Conversation

1.6k

mohitagw15856/pm-claude-skills

Have the conversation about someone's end-of-life wishes — before a crisis forces it — gently, respectfully, and thoroughly enough to actually guide decisions later. Use when asked how do I talk about end-of-life wishes, discuss my parent's wishes, advance care planning conversation, or ask about their medical and final wishes. Produces a way to open this hard conversation without it feeling morbid or forced, the areas to cover (medical wishes, care preferences, where they want to be, what matters to them, practical/legal), how to listen rather than impose, and how to document and share what's

Research & ScienceIn 1 list281

Cn Thesis Proposal

1.6k

mohitagw15856/pm-claude-skills

Use when asked 帮我写开题报告, 开题答辩怎么准备, 文献综述怎么写, 技术路线图, 研究内容和创新点, or write a thesis proposal for a Chinese university. Produces a 开题报告 in the section order Chinese universities use (选题背景与意义, 国内外研究现状, 研究内容与目标, 研究方法与技术路线, 创新点, 研究基础, 进度安排, 预期成果, 参考文献), a literature review plan, a technical route diagram in text, and the questions the 开题答辩 panel is likely to ask.

Research & ScienceIn 1 list281

Functional Assessment Prep

1.6k

mohitagw15856/pm-claude-skills

Prepare for a disability or illness benefit assessment (a functional or work capability assessment, a medical review, a disability evaluation interview): describe how the condition affects daily life on a bad day, gather evidence, and know what to bring and say. Use when someone says 'I have a benefit assessment next week', 'how do I prepare for my disability assessment', 'they say I can do more than I can', or 'what should I say at my medical review'. Produces a day-in-my-life description, an evidence list, answers to common questions, and a plan for the day and afterwards.

Research & ScienceIn 1 list281

Browse the most popular Claude skills, all research & science skills, or write your own with the skills generator.