Create Work Breakdown Structure

Create a Work Breakdown Structure (WBS) and WBS Dictionary from project charter deliverables. Covers hierarchical decomposition, WBS coding, effort estimation, dependency identification, and critical path candidates. Use after a project charter is approved, when planning a classic or waterfall project with defined deliverables, breaking a large initiative into manageable work packages, or establishing a basis for effort estimation and resource planning.

45 stars 4 forksData & Analytics

Install

skills CLI (Claude Code, Cursor, Codex and more)
npx skills add pjt222/agent-almanac --skill create-work-breakdown-structure
Manual install
git clone --depth 1 https://github.com/pjt222/agent-almanac.git /tmp/agent-almanac
mkdir -p ~/.claude/skills
cp -r /tmp/agent-almanac/i18n/caveman-lite/skills/create-work-breakdown-structure ~/.claude/skills/create-work-breakdown-structure

Personal skills live in ~/.claude/skills. Use .claude/skills in a project folder to share a skill with your team.

From the SKILL.md

# Create a Work Breakdown Structure

Decompose project scope into a hierarchical set of work packages that can be estimated, assigned, and tracked. The WBS provides the foundation for effort estimation, resource planning, and schedule development by breaking down complex deliverables into manageable components.

## When to Use

- After a project charter is approved and scope is defined
- Planning a classic/waterfall project with defined deliverables
- Breaking down a large initiative into manageable work packages
- Establishing a basis for effort estimation and resource planning
- Creating a shared understanding of all required work

## Inputs

- **Required**: Approved project charter (especially scope and deliverables sections)
- **Required**: Project methodology (classic/waterfall, or hybrid with WBS for planning)
- **Optional**: Historical effort data from similar projects
- **Optional**: Team composition and available skills
- **Optional**: Organizational WBS templates or standards

## Procedure

### Step 1: Extract Deliverables from Charter
Read the project charter. List all deliverables and acceptance criteria. Group them into 3-7 top-level categories (these become WBS Level 1 elements).

**Got:** List of Level 1 WBS elements matching charter deliverables.

**If fail:** If charter is vague, return to `draft-project-charter` to refine scope.

### Step 2: Decompose into Work Packages
Read the full skill on GitHub

Details

Skill name
create-work-breakdown-structure
Path
i18n/caveman-lite/skills/create-work-breakdown-structure/SKILL.md
License
MIT
Repo updated
18 November 2026

FAQ

What does the Create Work Breakdown Structure skill do?

Create a Work Breakdown Structure (WBS) and WBS Dictionary from project charter deliverables. Covers hierarchical decomposition, WBS coding, effort estimation, dependency identification, and critical path candidates. Use after a project charter is approved, when planning a classic or waterfall project with defined deliverables, breaking a large initiative into manageable work packages, or establishing a basis for effort estimation and resource planning.

How do I install the Create Work Breakdown Structure skill?

skills CLI (Claude Code, Cursor, Codex and more): npx skills add pjt222/agent-almanac --skill create-work-breakdown-structure. Skills go in ~/.claude/skills (personal) or .claude/skills (project), and Claude loads them automatically when a task matches the description.

Is Create Work Breakdown Structure popular?

It lives in pjt222/agent-almanac, which has 45 GitHub stars and 4 forks, and is included in 1 curated skill list.

Related skills

Adapt Architecture

45

pjt222/agent-almanac

Execute structural metamorphosis using strangler fig migration, chrysalis phases, and interface preservation. Covers transformation planning, parallel running, progressive cutover, rollback design, and post-metamorphosis stabilization for system architecture evolution. Use when assess-form has classified the system as READY for transformation, when migrating from monolith to microservices, when replacing a core subsystem while dependents continue operating, or when any architectural change must be gradual rather than big-bang.

Software DevelopmentIn 1 list

Adaptic

45

pjt222/agent-almanac

Master skill composing the 5-step synoptic cycle for panoramic synthesis across multiple domains. Orchestrates meditate, expand-awareness, observe, awareness, integrate-gestalt, and express-insight into a coherent process that produces unified understanding rather than sequential compromise. Use when a problem genuinely spans 3+ domains and the interactions between domains matter more than depth in any one, when sequential analysis feels like compromise rather than integration, or before major architectural decisions affecting multiple stakeholders.

OtherIn 1 list

Add Puzzle Type

45

pjt222/agent-almanac

Scaffold a new puzzle type across all 10+ pipeline integration points in jigsawR. Creates the core puzzle module, wires it into the unified pipeline (generation, positioning, rendering, adjacency), adds ggpuzzle geom/stat layers, updates DESCRIPTION and config.yml, extends the Shiny app, and creates a comprehensive test suite. Use when adding a completely new puzzle type to the package or following the 10-point integration checklist to ensure nothing is missed end-to-end.

Testing & QAIn 1 list

Draft Project Charter

45

pjt222/agent-almanac

Draft a project charter that defines scope, stakeholders, success criteria, and initial risk register. Covers problem statement, RACI matrix, milestone planning, and scope boundaries for both agile and classic methodologies. Use when kicking off a new project or initiative, formalizing scope after an informal start, aligning stakeholders before detailed planning begins, or transitioning from discovery to active project work.

Data & AnalyticsIn 1 list

Create Spatial Visualization

45

pjt222/agent-almanac

Create interactive maps, elevation profiles, and spatial visualizations from GPX tracks, waypoints, or route data using R (sf, leaflet, tmap) or Observable (D3, deck.gl). Covers data import, coordinate system handling, map styling, and export to HTML or image formats. Use when visualizing a planned or completed tour route on an interactive map, creating elevation profiles for hiking or cycling routes, overlaying waypoints and POIs on a basemap, or building a web-based trip dashboard.

Data & AnalyticsIn 1 list

Enhance Glyph

45

pjt222/agent-almanac

Improve an existing R-based pictogram glyph for the visualization layer. Covers visual audit of the current glyph, diagnosis of specific issues (proportions, readability, glow balance), targeted modifications to the glyph function, re-rendering, and before/after comparison. Works for skill, agent, and team glyphs. Use when a glyph renders poorly at small sizes, its visual metaphor is unclear, it has proportion issues, the neon glow effect is unbalanced, or after adding new palettes or changing the rendering pipeline.

Data & AnalyticsIn 1 list

Browse the most popular Claude skills, all data & analytics skills, or write your own with the skills generator.