Change Order Writer

Draft a defensible construction change order with entitlement basis, scope delta, itemised pricing, and schedule impact. Use when asked to write a change order, price extra work, draft a CO or COR/PCO, respond to a directive for changed work, or paper a field change. Produces a complete change order request with contract-clause entitlement, labour/material/equipment/OH&P breakdown, time impact statement, and reservation of rights.

1,573 stars 281 forksWriting & Content Plugin marketplace

Install

Claude Code plugin
/plugin marketplace add mohitagw15856/pm-claude-skills

The repo is a Claude Code plugin marketplace. Run /plugin afterwards to pick the plugin that includes this skill.

skills CLI (Claude Code, Cursor, Codex and more)
npx skills add mohitagw15856/pm-claude-skills --skill change-order-writer
Manual install
git clone --depth 1 https://github.com/mohitagw15856/pm-claude-skills.git /tmp/pm-claude-skills
mkdir -p ~/.claude/skills
cp -r /tmp/pm-claude-skills/plugins/pm-construction/skills/change-order-writer ~/.claude/skills/change-order-writer

Personal skills live in ~/.claude/skills. Use .claude/skills in a project folder to share a skill with your team.

From the SKILL.md

# Change Order Writer Skill

A change order that just says "extra work — $48,500" gets cut in half in review. A defensible one answers three questions before they're asked: *why am I entitled* (which contract clause, triggered by what event), *what exactly changed* (scope delta from the contract baseline), and *what does it really cost* (built-up pricing plus time). This skill drafts change orders that survive an owner's rep audit — and preserves rights on the impacts you can't price yet.

## What This Skill Produces

- A complete **change order request (COR/PCO)** ready for letterhead
- **Entitlement narrative** citing the contract clause and the triggering event/document
- **Scope delta** — contract baseline vs. changed condition, with document references
- **Pricing breakdown**: labour, material, equipment, subcontractor cost, then OH&P per the contract markup provisions
- **Schedule impact statement** and a **reservation of rights** for cumulative/unquantified impacts

## Required Inputs

Ask for what's missing; from a thin brief, draft anyway and mark every gap `[confirm]`:

- **The change event** — what happened (RFI answer, design revision, differing site condition, owner directive, regulatory change) and when it was discovered
- **Contract references** — changes clause number, notice requirements, allowed markup percentages, unit rates if any
- **Baseline scope** — what the contract documents required before the change
Read the full skill on GitHub

Details

Skill name
change-order-writer
Path
plugins/pm-construction/skills/change-order-writer/SKILL.md
License
MIT
Repo updated
18 November 2026

FAQ

What does the Change Order Writer skill do?

Draft a defensible construction change order with entitlement basis, scope delta, itemised pricing, and schedule impact. Use when asked to write a change order, price extra work, draft a CO or COR/PCO, respond to a directive for changed work, or paper a field change. Produces a complete change order request with contract-clause entitlement, labour/material/equipment/OH&P breakdown, time impact statement, and reservation of rights.

How do I install the Change Order Writer skill?

Claude Code plugin: /plugin marketplace add mohitagw15856/pm-claude-skills. Skills go in ~/.claude/skills (personal) or .claude/skills (project), and Claude loads them automatically when a task matches the description.

Is Change Order Writer popular?

It lives in mohitagw15856/pm-claude-skills, which has 1,573 GitHub stars and 281 forks, and is included in 1 curated skill list.

Related skills

Ab Test Planner

1.6k

mohitagw15856/pm-claude-skills

Diseña pruebas A/B estadísticamente rigurosas para características de producto, cambios de UI, flujos de onboarding y experimentos de precios. Úsalo cuando te pidan configurar un experimento, diseñar una prueba A/B, calcular tamaño de muestra o interpretar resultados de pruebas. Produce un plan de prueba completo con hipótesis, definición de variantes, tamaño de muestra, estimación de duración, métricas de seguridad y una guía de interpretación de resultados.

Testing & QAIn 1 list281

Ab Test Planner

1.6k

mohitagw15856/pm-claude-skills

प्रोडक्ट फ़ीचर, UI बदलाव, ऑनबोर्डिंग फ़्लो और प्राइसिंग प्रयोगों के लिए सांख्यिकीय रूप से कठोर A/B टेस्ट डिज़ाइन करें। जब कोई प्रयोग सेट करने, A/B टेस्ट डिज़ाइन करने, सैंपल साइज़ निकालने या टेस्ट के नतीजे समझाने को कहे, तब इसका उपयोग करें। परिकल्पना, वेरिएंट की परिभाषा, सैंपल साइज़, अवधि का अनुमान, गार्डरेल मेट्रिक और नतीजों की व्याख्या की गाइड के साथ एक पूरा टेस्ट प्लान तैयार करता है।

Testing & QAIn 1 list281

Accessible Travel Planner

1.6k

mohitagw15856/pm-claude-skills

Summarise what Accessible Travel Planner does in one line. Use when asked to [trigger phrases the user would say]. Produces [the concrete artifact].

Frontend & DesignIn 1 list281

Cn Civil Exam Essay

1.6k

mohitagw15856/pm-claude-skills

Practise the essay paper (申论) of the Chinese civil service examination (国考 / 省考): work a question from the given materials (给定资料), find the scoring points (要点), draft an answer in the expected format, and mark it the way examiners do. Use when asked 申论怎么写, 帮我批改申论, 归纳概括题怎么答, 申论大作文, 公文写作题, or practise the shenlun paper. Produces a question-type diagnosis, the points extracted from the materials with their source paragraphs, a model answer within the word limit, a marking of the person's own answer against the points, and a practice plan.

Writing & ContentIn 1 list281

Case Study Writeup

1.6k

mohitagw15856/pm-claude-skills

Write a client case study that sells future work — challenge, approach, results. Use when asked to write a case study, a client success story, a project write-up, or a portfolio case for consulting/agency work. Produces a results-led case study — the client & challenge, your approach, quantified outcomes, a client quote slot, and a takeaway — structured to win the next client. Ready to export as a designed PDF.

Writing & ContentIn 1 list281

Cn Civil Exam Interview

1.6k

mohitagw15856/pm-claude-skills

Practise the structured interview (结构化面试) for Chinese civil service and public institution posts (公务员面试 / 事业单位面试): the common question types, a clear answer structure for each, timed mock rounds and feedback on content, structure and delivery. Use when asked 公务员面试怎么准备, 结构化面试题, 帮我模拟面试, 综合分析题怎么答, 应急应变题, or practise the civil service interview. Produces a question-type guide, answer frameworks with worked examples, a timed mock interview asked one question at a time, scored feedback, and a practice plan up to the interview date.

Writing & ContentIn 1 list281

Browse the most popular Claude skills, all writing & content skills, or write your own with the skills generator.